Progress continues.
First up the spare wheel goes on.
Then went around fitting door check straps so the new body work doesn’t get damaged by flying doors.
Then I fitted the door seals.
Then I fit the battery tray and the two new batteries – this is tight. I think I will need to raise the lid for the battery box.
On to the hand brake lever for the newly fitted X-Brake.
Cubby box went in.
Now to start plumbing in the power, firstly the split charge (X-Charge) system, so I cut and made up some new power leads at the same time.
And that’s it so far, she’ll soon be back!
No comments:
Post a Comment